Skip to content
Bidnora Engineering
CSI division pricing

Construction Cost Estimating Services

Bid-ready cost estimates built line by line from your drawings, with material, labor and equipment priced for the project's ZIP code, so your number holds up on bid day.

  • 24–72 hrTypical turnaround
  • Local pricingAdjusted to your ZIP code
  • Addenda includedUpdates until bid day

Request a Fast Project Quote

Get a fixed price and delivery date for your plans.

Upload plans / specs (optional)

Drag & drop files here, or browse

PDF, DWG, DXF, ZIP or images · up to 100 MB total

Text message consent (optional)

See our Privacy Policy and SMS Terms.

Confidential. Prefer more detail? Use the full quote form

Two engineers in uniforms reviewing printed project plans
Bidnora EngineeringCost Estimating
Service overview

Detailed Cost Estimates You Can Bid With

A construction cost estimate is only useful if you can trust every line. Our estimators build each estimate from a full quantity takeoff of your drawings and specifications, then price materials, labor, equipment and subcontracted work using current costs for your project's location.

Estimates are organized by CSI MasterFormat division, so they drop straight into your bid forms, budgets or schedule of values. Every assumption, allowance and exclusion is written down, so your team knows exactly what is and isn't included before bid day.

What you receive

  • Itemized estimate in unlocked Excel
  • Marked-up takeoff PDFs
  • Material, labor and equipment breakdown
  • Assumptions, allowances and exclusions
  • Bid summary by CSI division

Who it's for

  • General contractors
  • Subcontractors
  • Developers & owners
  • Architects & engineers

Software we use

  • Bluebeam Revu
  • PlanSwift
  • On-Screen Takeoff
  • RSMeans data
  • Microsoft Excel
What's included

What's Included in Every Cost Estimate

Every estimate is itemized, so your team, the owner or a lender can follow how each number was built.

  • Quantity takeoff

    Counts, lengths, areas and volumes measured from every sheet, with waste factors and net-to-gross conversions shown.

    Bluebeam & PlanSwiftDivisions 01–49
  • Labor costing

    Crew rates for union, open-shop or prevailing-wage work, including burden, taxes and productivity for each task.

    Local wage dataBy ZIP code
  • Equipment & general conditions

    Lifts, cranes, scaffolding, dumpsters, temporary facilities and supervision, sized to the project schedule.

    Division 01Schedule-based
  • Contingency allowance

    Design, escalation and site-condition allowances listed separately so you can defend them or adjust them.

    Risk registerEscalation-ready
  • Phase-by-phase budget

    Costs split by phase or building area to support cash-flow planning, lender draws and the schedule of values.

    Cash-flow viewSOV-ready
  • Value engineering

    Alternate materials and methods priced side by side, with the savings each option would bring.

    Alternates listPriced options
Estimate types

Estimate Types for Every Project Milestone

Choose the level of detail that matches where your design and procurement stand.

  1. Stage 01

    Feasibility / ROM

    Concept & site studies

    Order-of-magnitude budgets from sketches, site plans or square-footage targets to test whether a project pencils out.

    Typical accuracy±20–30%
  2. Stage 02

    Schematic & DD

    30–70% drawings

    Trade-by-trade budgets as the design develops, flagging scope growth early and comparing system options.

    Typical accuracy±10–15%
  3. Stage 03 · Most requested

    Bid & Tender

    Construction documents

    Hard-dollar pricing from complete drawings and specs, organized to compare against sub bids line by line.

    Typical accuracy±5%
  4. Stage 04

    Construction Control

    After award

    Change order pricing, addenda updates and schedule-of-values checks while the job is underway.

    Typical turnaround24–48 hrs
How we work

Our 5-Step Estimating Process

A repeatable workflow that takes your plans from upload to a checked, editable estimate.

  1. 1

    Share plans & specs

    Upload drawings, specifications and addenda, or send a plan-room link. Tell us your bid date and any scope to exclude.

  2. 2

    Scope review & questions

    An estimator reviews every sheet, flags missing details or conflicts and sends questions you can turn into RFIs.

  3. 3

    Quantity takeoff

    Each item is measured and color-coded by CSI division, so any quantity can be traced back to the sheet it came from.

  4. 4

    Local labor & material pricing

    Quantities are priced with labor and material rates for the project's location, then checked against current supplier pricing.

  5. 5

    Peer review & delivery

    A second estimator checks the file before you receive the unlocked Excel workbook and marked-up PDFs.

Plan markup · Sheet A-102Scale 1/4" = 1'-0"

Zone A: Slab on grade

2,140 SF · 26.4 CY

Zone B: 1-hr rated walls

480 LF · 4,320 SF

Zone C: MEP rough-in

Div 22 / 23 / 26 runs

QA checked
Layered vector PDFLinked Excel quantities
Sample deliverable

Audit-Ready MasterFormat Estimate Sheet

The same format you'll receive: grouped by division, with material, labor and equipment broken out on every line.

Commercial shell & core · division breakdownLocation factor: Dallas, TXIllustrative example
Live formulas, unlocked cellsLabor burden included · Unit rates set for current market
Commercial shell & core · division breakdown
CSI codeDescriptionQtyUnitMaterialLaborEquip.Total
Division 03 — Concrete
03 30 004,000 PSI slab on grade, 6" with vapor barrier48,500SF$4.85$3.10$0.65$417,100.00
03 21 00#4 Grade 60 rebar, 16" O.C. each way54.2TON$1,620.00$980.00$140.00$148,508.00
03 11 00Slab edge formwork1,240LF$5.20$11.40$1.10$21,948.00
Division 05 — Metals
05 12 00Structural steel framing, W-shapes & HSS186.4TON$2,450.00$1,280.00$420.00$773,560.00
05 31 001.5" 20 GA galvanized roof deck52,000SF$2.65$1.15$0.25$210,600.00
Division 09 — Finishes
09 22 163-5/8" 20 GA metal studs, 16" O.C.18,200SF$1.45$2.20$0.10$68,250.00
09 29 005/8" Type X gypsum board, Level 4 finish36,400SF$0.85$1.40$0.05$83,720.00
Direct cost subtotal$1,723,686.00
General conditions, overhead & profit (12%)$206,842.32
Design & escalation contingency (3%)$51,710.58
Estimated bid value$1,982,238.90
  • Marked-up PDF drawings included
  • Unlocked Excel (.xlsx)
  • Rush turnaround available
Get the Full Sample Package
Project types

Project Sectors We Estimate

Experience across commercial, residential, institutional and public work in all 50 states.

  • Residential

    Custom homes, additions, remodels and production housing, from single plans to whole subdivisions.

    Custom to production

  • Commercial Office

    Core-and-shell buildings, tenant fit-outs, renovations and corporate interiors.

    Shell & interiors

  • Retail & Hospitality

    Restaurants, retail centers, hotels and multi-site rollouts that need consistent pricing.

    Single site or rollout

  • Multi-Family

    Garden-style, podium and mid-rise apartments, senior living and student housing.

    Wood, podium & mid-rise

  • Industrial & Warehouse

    Distribution centers, manufacturing plants, cold storage and flex buildings.

    Tilt-up & pre-engineered

  • Healthcare

    Medical offices, clinics, surgical centers and hospital renovations with specialty systems.

    Specialty MEP

  • Education

    K-12 schools, university buildings, labs and athletic facilities, including phased work.

    Prevailing wage ready

  • Public Works & Civil

    Municipal buildings, fire and police stations, parks and site infrastructure.

    Public bid formats

Why Bidnora

Engineered for Bid Accuracy & Win Rates

Losing a bid by a small margin hurts; winning one you underpriced hurts more. Our estimates are built to be competitive and defensible.

  • On-time delivery: You get a committed delivery date before work starts, set ahead of your bid deadline.

  • Unlocked, native files: Adjust margins, labor multipliers or tax rates yourself in the Excel workbook.

  • One estimator per project: A named estimator is available by phone and email for pre-bid questions.

  • Addenda updates: When an addendum lands before bid day, we update the takeoff and pricing to match.

“We use Bidnora for overflow when we're bidding several jobs at once. Their numbers line up with the sub bids we get back, which is exactly what we need.”
Sarah J.Chief Estimator, general contractor · Denver, CO
Common questions

Cost Estimating FAQs

Accuracy depends on how complete the drawings are. Estimates from full construction documents typically land within a few percent of awarded subcontractor pricing, while conceptual budgets carry wider ranges. Every estimate lists its assumptions and exclusions so you know exactly what's included.

Ready for bid day

Get Your Construction Cost Estimate Started Today

Send us your drawings and get a fixed quote and delivery date. Win more bids with numbers you can stand behind.

  • 100% confidential
  • NDA on request
  • Fixed price before we start
CallGet a Quote