Skip to content
Bidnora Engineering

For masonry contractors

Masonry Estimating & Takeoff Services

CMU, brick and stone counted wall by wall, with mortar, grout, reinforcing and accessories included, so your masonry bid reflects what's actually drawn.

  • CSI Division 04 coverage
  • Unit counts by wall type
  • Grout & rebar included
DWG A-201 · Exterior elevations

Two-story retail building

Illustrative example

QA checked
  • 8" CMU, standard units12,480 EA
  • Face brick, modular38,600 EA
  • Cell & bond beam grout41 CY
  • Horizontal joint reinforcement9,860 LF
CSI 04 22 00 Concrete unit masonryExcel ready
Turnaround
24–48 hr
Typical for single-building packages
Units
EA, SF & LF
Units, wall area and lintels
Reinforcing
Included
Vertical bars and joint reinforcement
Coverage
Division 04
Block, brick, stone and veneer
Scope coverage

Complete Division 04 Masonry Quantities

Every wall measured by type, with openings deducted and the hidden materials counted too.

  • CMU walls

    Block counts by size and type, with openings deducted and bond beams called out.

  • Brick veneer

    Face brick by wall area and bond pattern, with special shapes and soldier courses.

  • Stone & cast stone

    Natural and manufactured stone, sills, coping and trim pieces by size.

  • Mortar & grout

    Mortar by unit count, and grout volumes for filled cells and bond beams.

  • Reinforcing

    Vertical bars by spacing, horizontal joint reinforcement and dowels to footings.

  • Lintels & bond beams

    Steel and precast lintels and bond beam lengths at every opening.

  • Flashing & ties

    Through-wall flashing, weeps, veneer ties and control joint materials.

  • Cavity insulation

    Cavity insulation and air barrier areas where they're part of the masonry scope.

  • Scaffolding & access

    Wall heights and lengths to plan scaffolding, lifts and staging.

What you receive

See What You Receive in Your Masonry Package

Color-coded plan markups paired with an unlocked takeoff sheet you can load straight into your bid.

Marked-up plan sheet (.PDF)Vector

North elevation: 8" CMU

3,420 SF · 3,850 units

Brick veneer, modular

5,560 SF · 38,600 units

Bond beams at 4'-0" & roof

1,280 LF

Openings deducted (42 EA)

1,180 SF removed

Every measurement is color-coded and tied to its sheet number.

Itemized takeoff sheet (.XLSX)Unlocked
Sample masonry takeoff quantities
ItemCSINetUnitWasteGross
8" CMU, standard units04 22 0011,090EA5%11,645
8" CMU, bond beam units04 22 00960EA5%1,008
Face brick, modular04 21 1338,600EA5%40,530
Type S mortar04 05 13640BAG10%704
Cell & bond beam grout04 05 1641CY8%45
Horizontal joint reinforcement, 9 GA04 05 199,860LF5%10,353

Live formulas: change any waste factor and the gross quantity updates.

Illustrative example. Counts are grouped by elevation and wall type, so labor and material can be priced separately.

How we price

How We Price Your Masonry Bid

Masonry margins live in the details. We price each cost group on its own so you can see where the money goes.

  1. Cost group 01

    Materials

    Block, brick, stone, mortar, grout and reinforcing priced from suppliers near your project.

    Local supplier pricing

  2. Cost group 02

    Labor

    Mason and tender hours by unit type, wall height and complexity, at the right wage rates for the job.

    Units per mason-day

  3. Cost group 03

    Equipment

    Scaffolding, mast climbers, forklifts, mixers and saws for the length of the work.

    Access & mixing

  4. Cost group 04

    Overhead & Profit

    Cold-weather protection, cleanup, testing and the markup you set.

    Your markup & contingency

Who it's for

Tailored Masonry Estimating Workflows

Organized for the people who build, buy and supply masonry.

Masonry subcontractors

Bid more block and brick packages without tying up your estimator on unit counts.

  • Counts by wall type & elevation
  • Accessory lists ready to order

General contractors

Check masonry sub bids against independent counts and catch missing lintels, flashing or reinforcing.

  • Bid leveling support
  • Scope gap review

Masonry suppliers

Unit counts and accessory lists your counter staff can quote quickly.

  • Units by size & color
  • Mortar and grout totals
Why Bidnora

Why Masonry Contractors Choose Bidnora

  1. 1

    Accurate unit counts

    Openings are deducted and special units counted separately, so your order matches the wall.

  2. 2

    Nothing hidden in the wall

    Grout, rebar, ties and flashing are measured, not guessed.

  3. 3

    Production-friendly breakdowns

    Quantities by elevation, height and wall type make labor pricing faster.

  4. 4

    Revisions highlighted

    When elevations change, updated counts show exactly what moved.

  5. 5

    Clear exclusions

    Your scope sheet spells out what's in and out before you sign.

“The color-coded markups make checking quantities quick. We bid more drywall and framing work last quarter than ever, without adding an estimator.”
Marcus V.Preconstruction Manager, drywall contractor · Dallas, TX

Estimates built with industry-standard software

  • PlanSwift
  • Bluebeam Revu
  • RSMeans Data
  • On-Screen Takeoff
  • Microsoft Excel
Free quote

Get a Masonry Takeoff Quote

Send what you have and we'll reply with a fixed price and delivery date before any work starts.

What to send

  • Drawings as PDF or CAD files, or a plan-room link
  • Specifications, or just the sections for your scope
  • Any addenda issued so far
  • Your bid date and anything to include or exclude

Request a Masonry Quote

Get a fixed price and delivery date for your plans.

Upload plans / specs (optional)

Drag & drop files here, or browse

PDF, DWG, DXF, ZIP or images · up to 100 MB total

Text message consent (optional)

See our Privacy Policy and SMS Terms.

Confidential. Prefer more detail? Use the full quote form

Common questions

Masonry Estimating FAQ

Yes. Doors, windows and louvers are deducted from wall areas, and lintels or bond beams at each opening are counted separately.

Ready for bid day

Need Masonry Counts for Your Next Bid?

Upload your drawings and get a fixed quote for a complete block, brick and stone takeoff.

  • 100% confidential
  • NDA on request
  • Fixed price before we start
CallGet a Quote